Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across The Colony
If you’re planning an addition or an ADU in The Colony, you’re working on a house that’s already been through 20 to 35 North Texas summers, hail seasons, and clay movement. That changes the job. We know The Colony’s subdivisions off Main Street and South Colony Boulevard, the lakefront and near-lake lots along Lewisville Lake, and the permits that come with each. Barrett & Sons Construction has been an owner-operated company since 1998, and our technicians bring up to 28 years of experience to projects like yours. Call (877) 382-4108 to schedule a free estimate. One of the reasons people here call us first is simple: Tom Barrett’s name, address, and license number are published, so you can look them up before you sign anything.
Why Barrett & Sons Construction Plano Is The Colony’s Preferred Home Additions & ADU Company
The Colony is a built-out, master-planned lakeside suburb, which means almost every addition here is a remodel or rebuild of an existing 1980s – 2000s home rather than new construction on a bare lot. We build for that reality. Every eligible job includes permits pulled and inspections signed, because the last contractor many homeowners used told them permits were optional. Scope, allowances, and any price change arrive in writing before work moves, and the 90-Day Done Right Promise is written on every contract. We live close by, we answer the phone with a live person every hour of the day, and our crew members are background-checked and carry the Barrett & Sons name. Whether you’re off Paige Road or a few blocks from the shoreline, you’ll get straight pricing and a written plan.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in The Colony
We focus on the work this city actually needs: second-story additions, detached ADUs, sunrooms, and enclosed patios on established lots. Our Home Additions & ADU team handles the whole job, from engineering and permit review to framing and inspection sign-off.
Second Story Additions
Adding a second story in The Colony means working around a foundation that was designed for a single load, plus roof-to-wall connections that have to hold up to straight-line wind and hail. On 1990s brick-veneer homes off Main Street, the plan starts with an engineer reviewing the existing slab and framing before anything gets drawn. Wind-rated windows and a properly tied roof structure aren’t extras here. They’re what the inspector signs off on, and what your insurer looks at later.

New Detached ADU
A detached ADU in The Colony runs $90,000 – $220,000, and the wind rating and foundation design drive that number more than finishes do. On inland lots, the work is a separate slab on black clay with a load-bearing transition to whatever it touches. Near the lake, it can mean elevated pier-and-beam and a drainage plan reviewed before the permit issues.

Sunrooms & Enclosed Patios
Enclosing a patio is one of the most popular projects in The Colony, and it’s also where cheap bids cut corners. A sunroom addition needs rated glazing and a roof-to-wall connection that passes inspection. If you’re within the lake-management or floodplain zones, the drainage and elevation review has to happen before framing, not after. We put all of it in the written scope.

ADU Design & Permitting
Design and permitting is where a lot of ADU projects stall, and it’s where we start. We build the permit set around The Colony’s requirements, including wind-load and foundation details, and we don’t frame until the inspection steps are clear. That’s why the permit set, not the framing crew, usually sets the schedule on these jobs.
Trusted Brands We Service in The Colony
For ADUs and additions, we work with manufacturers whose specs you can actually look up. Prefabricated and panelized systems from Dvele, Mighty Buildings, and Plant Prefab each carry documented wind and structural ratings, which matters when your addition has to pass The Colony inspection and stand up to hail and straight-line wind. We don’t claim to stock anyone’s parts locally; we specify the product, order it to the approved plan, and install to the manufacturer’s stamped details. That paper trail is what supports your permit and your later insurance claim.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in The Colony Homes
- A low bid skips the engineered foundation transition. On The Colony’s expansive black clay, an addition tied to an existing post-tension slab without a proper load-bearing transition moves on its own and cracks at the tie-in, often within a season. The usual fix is cutting and capping the existing cables at the joint and getting engineering sign-off before framing.
- Lakefront and near-lake lots get planned like inland lots. Close to Lewisville Lake, a deck, sunroom, or detached ADU can fall under Corps of Engineers lake-management rules and floodplain elevation review. A quote that ignores that can stall at permit or force a redesign after framing is already up.
- Wind-rated products get value-engineered out. Non-rated windows and a below-code roof-to-wall connection on a second-story or sunroom fail inspection and weaken any later insurance claim. Rated windows ($8,000 – $25,000 installed) and a compliant roof connection aren’t upgrades you trim; they’re what the job requires.
- Clay movement stresses the existing slab. Homes built from the late 1980s through the 2000s are still settling on North Texas clay, and hail keeps the exterior in a constant replacement cycle. An addition has to account for both before it’s framed onto the house.
Pricing for Home Additions & ADU in The Colony, TX
Here’s roughly what this work runs in The Colony’s market. Home additions typically land between $45,000 and $130,000, an ADU between $90,000 and $220,000, and a garage conversion between $30,000 and $80,000. On the exterior side, impact windows run $8,000 – $25,000 and a metal roof $15,000 – $40,000. Those ranges move with foundation conditions, whether the lot is near the lake, and the wind rating your structure has to meet. A garage conversion or a small room addition sits at the low end; a fully engineered detached ADU near the water sits at the high end. We give no-hassle upfront pricing and put every allowance and every change order in writing before work touches the job. Call (877) 382-4108 for a free estimate, and bring any written bid you already have for a free second opinion.
| Project in The Colony | Typical Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
| Impact Window Installation | $8,000 – $25,000 |
| Metal Roof Installation | $15,000 – $40,000 |
We Also Serve Cities Near The Colony
We work across the surrounding area, not just The Colony. Homeowners in Frisco, Little Elm, Paloma Creek South, and Carrollton call us for the same additions, ADUs, and storm-rated exterior work. If you want to see the full picture of what we do in The Colony and the neighboring communities, it’s all in one place. Same written scope, same permits pulled, same phone number wherever you live.
Serving The Colony, TX – Our Local Coverage Area
We serve The Colony and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in The Colony

Your addition has to meet The Colony’s current wind-load requirements for the structure and glazing, and the way to check a bid is to look for the engineered wind-load detail and the rated-product specs in writing. North Texas spring hail and straight-line wind set the bar, so rated windows and a code-compliant roof-to-wall connection are required, not upgrades. A quote that doesn’t list the rating or the engineering has left something out. Call (877) 382-4108 and we’ll go through a bid with you, free.
Yes. Lakefront and near-lake lots can fall under Corps of Engineers lake-management rules and floodplain elevation review in addition to the city permit. That can mean a hydraulic or drainage study and an elevated pier-and-beam foundation for a deck, sunroom, or detached ADU, none of which an inland lot two miles away would trigger. It’s why the permit set usually sets the schedule on these jobs. Call (877) 382-4108 for a free estimate that accounts for it.
It should spell out an engineered tie-in to the existing slab, because black clay movement is the main reason additions crack here. On a typical 1990s brick-veneer home, that means a local pro cuts and caps the existing post-tension cables at the joint, dowels a new foundation with a load-bearing transition, and gets engineering sign-off before framing. If the quote skips the foundation transition, that’s your warning sign. Call (877) 382-4108 for an exact quote, free.
Put the permit, the inspection record, the wind-rated product specs, and every change order in writing before work happens. When a later insurance claim or premium gets evaluated, documented compliance is what backs you up; an unrated window or an unapproved scope change can muddy it. Our contracts carry the full scope, allowances, and the written 90-Day Done Right Promise. Call (877) 382-4108 to start, with a free second opinion on any estimate you have.
Summer heat compresses the exterior construction calendar here, so roof, sunroom, and framing work has to be sequenced around the worst of the day, and the quote should say how. It should also make clear that permits and any floodplain review run before framing, so the schedule reflects the permit timeline, not just the crew’s start date. A realistic written schedule beats an optimistic one. Call (877) 382-4108 for a free estimate and a schedule you can plan around.
Whether you’re adding a second story off Main Street, enclosing a patio near the lake, or building a detached ADU, the job in The Colony runs on paperwork as much as lumber. Scope in writing, allowances in writing, change orders in writing; that’s how the work holds up and how your records hold up later. Call (877) 382-4108 for a free estimate with Barrett & Sons Construction Plano. A live person answers, day or night, and if something’s ever wrong, one call brings Tom back.
Written by the team at Barrett & Sons Construction Plano.